Completed projects

Water Mitigation Nicole Macdonald Water Mitigation Nicole Macdonald

Water Mitigation Project 01

Location: Topanga
Scope of Work: Removal of non-salvageable ceiling and wall drywall on the main level, flood cuts on the second level, and structural drying of cabinetry where possible. Due to significant water damage on the lower floor, desiccant drying may be attempted, though flooring removal may be required.

Read More
Fire Mitigation Nicole Macdonald Fire Mitigation Nicole Macdonald

Fire Mitigation Project 02

Location: Los Angeles
Scope of Work: Fire damage restoration involving removal of melted plastic from furniture and canopy materials on floors and contents, and repair of fire-damaged jacuzzi, canopy drapes, and grill

Read More
Water Mitigation Nicole Macdonald Water Mitigation Nicole Macdonald

Water Mitigation Project 03

Location: Corona
Scope of Work: Replacement of flooring, baseboards, and paint across multiple rooms, with drywall repairs and insulation upgrades. Kitchen work includes cabinet replacement, refinishing, and countertop restoration. Additional tasks include vanity repair, stair closet carpet replacement, and garage drywall patching

Read More