Completed projects
Navigate to: All Projects
Water Mitigation Project 01
Location: Topanga
Scope of Work: Removal of non-salvageable ceiling and wall drywall on the main level, flood cuts on the second level, and structural drying of cabinetry where possible. Due to significant water damage on the lower floor, desiccant drying may be attempted, though flooring removal may be required.
Water Mitigation Project 02
Location: Long Beach
Scope of Work: Removal of walls affected by heavy mold growth, cleaning and sanitizing framing, and replacement of damaged structures.
Water Mitigation Project 03
Location: Corona
Scope of Work: Replacement of flooring, baseboards, and paint across multiple rooms, with drywall repairs and insulation upgrades. Kitchen work includes cabinet replacement, refinishing, and countertop restoration. Additional tasks include vanity repair, stair closet carpet replacement, and garage drywall patching