Location: Topanga
Scope of Work
Removal of non-salvageable ceiling and wall drywall on the main level, flood cuts on the second level, and structural drying of cabinetry where possible. Due to significant water damage on the lower floor, desiccant drying may be attempted, though flooring removal may be required.
Back to: All Projects